Projects
Our plant projects
Engineering delivered for Eti Maden, Eti Bakır, Elektrik Üretim A.Ş. and Ercan Enterprises, from concept to commissioning.

Bigadiç Granular Fertilizer Production Plant
- Client
- Eti Maden Enterprises
- Capacity
- 35,000 t/year
- Scope
- Detail engineering
- Commissioned
- 2024

Çayırhan Power Plant Ash & Slag Conveyor Line
- Client
- Elektrik Üretim A.Ş. (EÜAŞ)
- Capacity
- 2×1000 t/h
- Scope
- Detail engineering
- Commissioned
- 2025

Emet Boric Acid Production Plant
- Client
- Eti Maden Enterprises
- Capacity
- 200,000 t/year
- Scope
- Concept + detail engineering
- Commissioned
- 2023

Kırka Borax Pentahydrate Drying Plant
- Client
- Eti Maden Enterprises
- Scope
- End-to-end engineering
- Commissioned
- 2016

Yatağan Lump Coal Drying Plant
- Client
- Ercan Enterprises
- Capacity
- 15 t/h
- Scope
- End-to-end engineering

Adıyaman Copper Concentrate Filtration Plant
- Client
- Eti Bakır
- Scope
- Plant design

Küre Copper Concentrate Filtration Plant
- Client
- Eti Bakır
- Scope
- Plant design

Kırka Solid Waste Transportation System
- Client
- Eti Maden Enterprises
- Scope
- Conveyor system design

Samsun Copper Smelting Waste Filtration Plant
- Client
- Eti Bakır
- Scope
- Plant design