ETI MADEN/KIRKA
BORAX PENTAHYDRATE DRYING PLANT

PROJECT DESCRIPTION

  • Concept, application and detailed engineering projects of Borax Pentahydrate Drying Plant were prepared for Eti Maden Enterprises, Kırka Boron Facility.
  • Within the scope of borax pentahydrate drying plant project, a vibratory fluidized bed dryer, a steam operated heat exchanger, dust cyclones, a jet-pulse filter, equipment connections, etc.. were designed and consultancy services for the manufacturing and commisioning of the plant were offered.  
  • The plant was commisioned in 2016.

CUSTOMER NEEDS WITHIN THE SCOPE OF THE PROJECT

Our scope of work for the project was as follows:

  • Preparation of layout drawings,
  • Preparation of flow diagrams,
  • Preparation of manufacturing drawings,
  • Preparation of detail and application engineering drawings,
  • Control system design (Siemens),
  • Consultancy services during manufacturing,
  • Commisioning.
en_USEnglish